banner

Products

Water Cooled Chiller System Industrial Water Cooled Chiller

Water Cooled Chiller System Industrial Water Cooled Chiller

Package size per unit product 600.00cm * 300.00cm * 300.00cm Gross weight per unit product 1500.000kg Application · Prov
SHARE

Description

Basic Info
Selected Voltage 380V/50HZ
Compressor Number 1
Noise Level Low
Certification ISO
Temperature -70~+20deg.C
Cooling Capacity 0~18000kw
Refrigerant R717/R22/R404A/R507
Warranty 12months After Commercial Running or 18months
Application Petro-Chemical Industry, Food Industry
Transport Package Packing in Wooden Cases
Trademark BINGSHAN
Origin China
HS Code 841869
Packaging & Delivery
Package size per unit product 600.00cm * 300.00cm * 300.00cm Gross weight per unit product 1500.000kg
Product Description

Application
· Providing low-temperature chilled water and high-temperature hot water for air conditioning, and providing various temperature glycol and brine for processing.
· Widely used in theater; hotels, shopping malls, hospitals, restaurants, office buildings and other comfort air-conditioning systems; and the cooling of electromechanical equipment the production of instrumentation, textile, printing and other industrial air-conditioning system; and also widely used in various industrial production fields which need low-temperature.

Water Cooled Chiller System Industrial Water Cooled Chiller

  1. LS series provide following optional functions: A.Heat recovery; B.Ice thermo storage; C.Pressure of heat exchanger side: 1.6MPa and 2.0MPa;
  2. There are many optional application conditions for both using side and heat source side of RB series water(ground) source heat pump unit this catalogue only lists technical parameters of water circulation condition for model selection, and for detailed data of other conditions, including the work ing condition of groundwater and ultra-high temperature hot water(water outlet temperature higher than 80,C), please contact with us.
  3. If YC/YS series glycol/brine chiller are used under the circumstances of glycol/brine water outlet temperature below -10ºC. economizer and oil cooler are provided, please connect us if necessary.
  4. YC series units are only suitable for glycol as secondary refrigerant The YS series units can be used for secondary refrigerants such as calcium chloride and sodium chloride.

Technical Advantage
High performance semi-hermetic dual-compressor screw unit

Introducing the modern fourth generation of highly efficient rotor profile and special advanced KAPP rotor milling lathe, ensuring higher processing precision and working efficiency, improving the reliability of compressor operation.
Falling Film Evaporator with highly effective heat transfer performanceThe heat transfer performance of falling film evaporator is about 30% higher than flooded evaporator. Introducing special designed distributor and processing technology, the liquid refrigerant on the surface of heat exchange tube in the falling film area can be evenly formed into the film, which has a great advantage over boiling evaporation.
Widely applicationThe chiller can realize excellent performance not only in normal chilled water application, but also in -20°C outlet chilled water and over 80°C outlet hot water.
Environmental friendly and energy saving

Adopt R134a which has no damage to the ozone layer. Refrigerant charging quantity: 0.20~0.25kg/kW, 30-40% less than flooded compressor unit, which can fully reduce the greenhouse effect.
Among the alternative refrigerant which can replace R22, working pressure of R134a is about 50% lower than R404A and R507. The rotor leakage is reduced because of low pressure difference of R134a compressor, and the adiabatic efficiency and volumetric efficiency are improved compared with R404A and R507. The theoretical cycle efficiency of R134a is 12% higher than R404A and 6% higher than R507 on average, which is an obvious advantage of energy-saving over R404A and R507. Therefore, although the cost of R134a unit is higher than that of R404A and R507 due to the low refrigerating capacity per unit of swept volume, the BingShan falling film refrigerating units still have a full range of products with R134a refrigerant.
The energy efficiency ratio of LS series falling film semi-hermetic screw water chiller is above grade I or Hof national regulation GB19577. Due to the small temperature difference between glycol/brine outlet temperature and evaporating temperature, the energy efficiency ratio of YC/YS series falling film glycol/brine unit is 12-15% higher than dry glycol/brine unit and 5-10% higher than flooded glycol/brine unit.

Water Cooled Chiller System Industrial Water Cooled Chiller


Stable runnin
Adopt calculating opening control algorithm to calculate the best opening of electronic expansion valve according to the evaporating pressure, condensing pressure, compressor energy class, etc., which keeps the liquid level stable under various condition and ensures unit stable running.
Separating efficiency of oil separator is above 99.99%, which reduces the reliance on oil return and the liquid refrigerant quantity that come into compressor through ejector loop, avoids lowering the viscosity of the lubricating oil because of excessive liquid refrigerant which affects the service life of the :ompressor bearings, and keep the compressor long-term stable running.

Convenient operation and high intelligence
Convenient installation, just connect water pipe and power.
Large colored touch screen, free switch between manual control and automatic control. Adopt special microcomputer controller and high intellectualization.

Bingshan Group was founded in 1930(Investment by Panasonic & Chinese Goverment), there are 43 enterprises, which include 1 public company, 9 subsidiary enterprises (domestically funded enterprises), and 32 Sino-foreign joint ventures. Bingshan Group has total assets of 9.5 billion RMB and 12000 contracted employees. It's China's largest manufacturing base of refrigeration and air-conditioning equipment, agricultural deep processing equipment base, and one of the main bases of China's petrochemical general machinery equipment.

Dalian Bingshan Engineering & Trading (Hereafter referred to as BSET) is jointly funded professional trading company by Dalian Bingshan Group and Dalian Refrigeration in 1988. Concentrating on consulting, design, sales.

BSET provides quality products to different application fifields including fruit and vegetable, meat and poultry, seafood, beverage etc processing and freezing & refrigerating fifield etc.

BSET has undertaken hundreds of turnkey projects in Asia, Africa, America etc. more than 60 countries and regions, as well as offer customized energy optimization and sustainable cold chain solutions.

Water Cooled Chiller System Industrial Water Cooled Chiller

Main Application

Heating Ventilation Central Air Conditioning

Industrial Refrigeration

Food Refrigeration

Trading & Service

OEM & PART

Main Products

Screw Compressor Unit Series

Piston Compressor Unit Series

LiBr Absorption Chiller Series

Condenser and Cooling Tower Series

Evaporator Series

Quick Freezer Series

Commercial VRF Series, Air Handling Unit Series, Terminal Equipment Series

FAQ:

Q1.What is our main product ?

A1: Our company is a professional trading company funded by Dalian Refrigeration in 1988. Concentrate on consulting, design, sales, installation, commissioning and maintenance of the refrigeration equipments.

Q2.When can I get the price ?

A2:We usually offer the quotation within 2-3 work days for equipment and 5-10 work days for system after receiving your inquiry. For urgent offer, please contact with us for special.

Q3.What is the Trade Term?

A3: We accept Ex-work factory , FOB Dalian, CNF or CIF, as your requirement.

Q4.How long is our Production leading time?

A4: It depends on type of equipment.

For cold storage equipment, the lead time is 60-80days after receiving down payment or Letter of credit.

For Spiral Freezer, Tunnel Freezer, the lead time is 80-90days after receiving down payment or Letter of credit.

For flake ice making unit and plate freezer, the lead time is 45days after receiving down payment or letter of credit.

Q5.What is the Payment term?

A5: By 100% T/T before shipment or By L/C at sight.

Q6. During shipping, if there is a damage to products, how do you get replacement?

A6: Firstly, we should investigate the reason cause the damage. At the same time, we will claim for the insurance by ourselves or assist the buyer.

Secondly we will send the replacement to the buyer. The responsible person for above damage will take charge of the cost of the replacement.

Q7. What are your terms of packing?

A7: Packing: export worthy package suitable for container transportation.

Q8. Do you test all your goods before delivery?

A8: Yes, we have 100% test before delivery.

Q9: How do you make our business long-term and good relationship?

A9: Dalian Refrigeration was established on 1930. In past 88 years, we have set up our famous brand "Bingshan" not only in domestic market but also overseas market. How to make this brand life so long time? Good quality and reliable service create good reputation among the customers. Many customers keep adopting our system in past 20days extension of the business. Win-win business is our main task for the long-term cooperation.

Q10: Are you a factory or a trading company?

A10: We are the only door to overseas market for Dalian Refrigeration We have our own design team, installation team and after-sales team. We are professional engineering & trading company. We have set up branch office in Philippines, Malaysia, Thailand, Burma, Cambodia, Singapore, Bangladesh, Pakistan, Russian, Uzbekistan, Brazil, Argentina etc.

Q11: Where is your factory located?

A11: Our factory is located in Dalian, Liaoning province.

Q12: What is your warranty?

A12: Warranty: 12months after commercial running or 18months from the date of shipment, subject to the earlier expiry.

Q13: Can you arrange thirty party pre-shipment inspection

A13: Pre-shipment inspection: Supplier's pre-shipment inspection is Final; pre-shipment inspection by third Party on buyers cost.

Q14:Can we do our OEM logo?A14:Yes, for the products with drawing supplied by you, we of course apply your logo

Our Contact